|  | XGN GUIDELINES - How to make online applicaiton |
| | 
Click Image to Enlarge | 16. After clicking Air Stack in figure- 15, a screen appears as shown in figure- 16, please enter the details. If existing details are not appears on the screen, by clicking new stack please note “fuel consumption should per hour capacity.” | | | 
Click Image to Enlarge | 17. After selecting air stack, a screen will appear as shown in figure-17. Now from first field drop down menu, select source of air pollution i.e. process stack/flue gas stack. Here process stack means a stack attached to the process vessels and flue gas stack means a stack attached to the combustion activity i.e. boiler, oil heater etc. | | | 
Click Image to Enlarge | 18. After selecting process flue stack, select stack attached to in the second field. Please select the appropriate field from the drop down menu then a next field mentioned the height above ground level in meters. Similarly remarks and pollutants is to be filled up. In the field of air pollution control measures, select appropriate measures from the drop down menu and click on save. After saving a message will appear as per figure No.24, please click on OK in this message which will display the figure No.25 showing the details of the stack you have filled in. In case, the industrial activities is having more than one process stack or flue gas stack shall fill up the details of each stack by following the above procedure. | | |
|
|
|